Manufacturing
Europe

Volkswagen

Shopfloor Integration Management for VW

Business overview

Volkswagen AG, known internationally as the Volkswagen Group, is a German public multinational conglomerate manufacturer of passenger and commercial vehicles, motorcycles, engines and turbomachinery. Volkswagen partnered with Portainer to help securely manage their apps on their Shopfloor Integration Management (SIM) infrastructure.

The challenge

Before the release of SIM, the missing of standardization resulted in high investment costs and high personnel costs.

This can be illustrated using the example of setting up a new device. Initially, provisioning was handled by local maintenance staff. After connecting the device, the software was installed via USB, configured, and then checked for functionality. After the initial setup, it was assumed the device would run without issues for as long as possible. When an error occurred, the local maintenance staff needed to check the device at the shopfloor and, if necessary, reset it. This process reflects the significant effort and avoidable costs involved. With thousands of shopfloor devices across various Volkswagen Group brands, the cost-saving potential becomes clear. Previously, different suppliers developed individual solutions to address these challenges, leading to a strong dependence on specific products. These standalone solutions were often incompatible with others and only partially integrated into VW’s environment. As these systems scaled, vendor lock-in became inevitable.

results that matter

The real-world impact of smarter container management.

This is some text inside of a div block.

This is some text inside of a div block.

This is some text inside of a div block.

The solution

With the introduction of SIM, a scalable solution is now available to support shopfloor teams with the lifecycle management of their devices and to streamline maintenance processes. SIM was developed for loT data with low to intermediate frequencies and enables a highly automated application management through a production-oriented user interface. Every shopfloor device that supports container technology can be integrated into SIM. Each component is set up as a microservice and managed by Portainer. IoT applications can be remotely deployed via the user interface, which also provides detailed insights about each specific device. This approach lays the foundation for effective IT asset management.

As a first step, a public cloud connector was released to query data from the shopfloor. Data is collected, for example via Softing’s edgeConnectors, then preprocessed, filtered, and transferred to the Digital Production Platform (DPP), Volkswagen’s proprietary cloud solution aimed at improving productivity in production and logistics across its plants.

Thus, SIM is a scalable solution which ensures that only the required information is forwarded to the platform and unnecessary costs are eliminated. In addition, due to the strategic decision to only rely on standardized interfaces, protocols, and technology like software containers, a vendor lock-in is avoided. This is enabled by Portainer’s agnostic support for any container runtime or orchestrator.

Overall, SIM delivers containerized connectivity as a service, tailored to shopfloor-specific use cases, and compatible with a wide range of runtime environments.

The SIM support team can deliver a full local installation within two weeks and provides operational assistance. Two major DPP use cases are currently in place: VW2 Assembly Control and Optimization Filling Equipment. The SIM team also supports hosting and provides the necessary connectivity for several on-premise applications.

The entire SIM project team is proud of its outstanding achievements. For more information or questions, please contact:

Torsten Volkmar (VW SIM Project Team)

Tobias Mühlnikel (CPO & CTO, Edge Business Unit, Portainer.io)

Download a PDF version of the case study.

Volkswagen partnered with Portainer to help securely manage their apps on their Shopfloor Integration Management (SIM) infrastructure.

On-Prem Kubernetes Made Easy for Retail IT Teams

"With Portainer, deployment time has decreased significantly. It takes very little time for developers to publish the apps into our production environment using the GUI”.

Suat Urgurlu, Associate Director, Technology Solutions & IT Security
View case study

Empowering Customers with Self‑Service Container Management

“It’s actually quite easy. We never did it because we thought it would require a lot of Kubernetes knowledge, but it doesn’t.”

Remy Simons
View case study

Modernizing Legacy Infrastructure: KIT’s Journey to Container‑Powered Research

“In the past, we had to go to Africa and install research tools on a server there and in most of the cases that never really worked because then something crashed and the people were gone. With Portainer, we just take a container and put it somewhere else.”

Christof Lorenz, Scientific Data Manager
View case study

Transforming Legacy Infrastructure into Modern, Containerized Apps

"Within a week of having Portainer, we’ve been able to take deployment workflows from 2 hours to fully deploy, to 5 minutes."

Jim Bruce, Director of Technology
View case study

Streamlining AI Development & Deployment at Scale with Portainer

"Per day, I spent an hour or two easily on deployments and now with Portainer and full use, that'll probably go down to at most 5-10 minutes."

Zoe Matre, DevOps Manager
View case study

Enabling High Availability & Automation for Public-Facing Infrastructure

"I am able to quickly look at what’s going on, get a holistic view of everything. Very quickly I look at the stack and services – instead of digging up docker commands, it’s all automated."

Joshua O'Brien, Systems Engineer
View case study
Proctor & Gamble

P&G partners with Portainer to containerize their MES software

“It has taken time and some effort, but immediately the 20 users are already seeing major productivity gains."

Adefemi Ayaji, Application Platform Owner, Global
View case study

Accelerating container adoption by 2 years at Inter-State Studio and Publishing

"We shaved a good two years off the adoption of containerization because we had Portainer."

Jason Plumhoff, Lead Developer and Software Architect
View case study

Helping the University of Utah Streamline Infrastructure Across 35+ Labs

"Portainer is responsible for dropping my workload between 15 and 20% because I’m not going out and touching individual servers.”

Elliot Francis, Principal Software Engineer
View case study

01 / 00